Español | English | Français
CEINSA Contratas e Ingeniería

CEINSA carry out the refurbishment of the trading floor in main floor of the Bank of Spain c / Alcalá 48, Madrid.


	
		Details of the works.
Details of the works.

The Bank of Spain is a listed building within a Historic de la Villa de Madrid, and the upper range of archaeological protection Monument and ZPA Historic Precinct.
The renovation of the main floor were made in four different areas, which present an obvious deterioration and need a clear renewal and currently do not meet the functional needs required. Of particular importance is the recovery of the original spaces and heights in the area B, and restored in a manner consistent with the architecture of EdificioTradicional.
In the process of renovation of the facilities of the Bank of Spain, is intended to unify the entire main floor Patio surrounding the Operations functional areas to house offices with the appropriate degree of quality and comfort. We propose a single project that provides the same features for the entire plant.
The works will be implemented in joint venture with CYM Yañez SA. PRESS REVIEW.

2011-12-30 | News | Send Print

The Ministry of Development awards the contract for services of various conservation and exploitation operations in the province of Albacete


	Overview, pk 3, A-30.
Overview, pk 3, A-30.

The Ministry of Development has awarded CEINSA joint venture with General Construction Company Abaldo S.A. the Contract Services:

Implementation of various operations, maintenance and operation in the A-30 motorway Murcia, pk. 0.280 to 84.135, CN-301 Madrid-Cartagena, pk. 257.140 to 274.972, CN-301 Madrid-Cartagena, pk. 277.209 to 300.712, CN-301 Madrid Cartagena, pk. 303.117 to 327.780, CN-301 Madrid-Cartagena, pk. 328.300 to 337.460, CN-430 Badajoz, Valencia, pk. 419.7110 to 512.430, CN-crossing 430th Munera, pk. Ay 460.570 455.200 to the CN-430, a variant of Ossa de Montiel pk. 426.350 to 432.800. Albacete province.
 
annuities during 2012 to 2015. The estimated value of the contract including any renewals and contract amendments provided amounts to 19.1 M €. PRESS REVIEW.

2011-12-20 | News | Send Print

The City of Almaraz (Cáceres) awarded to CEINSA the works of the Town Hall

The City of Almaraz (Cáceres) awarded CEINSA Adequacy works as Town Hall Municipal Building, located at the Plaza of Spain.
The works consist of internal reform concentrated on ground floor and first floor to provide adequate social service, and giving the building of all the space needed for optimum performance. PRESS REVIEW.

2011-12-19 | News | Send Print

GESDESMA has proceeded to the reception of silvicultural treatments

The silvicultural systems in the mountains of public utility perimeter Aguirre, No. 140 and 141, La Sierra, La Raya, La Dehesa and others, No. 13, El Risco, No. 143, The District No 163 have been received definitely GEDESMA . PRESS REVIEW.

2011-12-16 | News | Send Print

Canal Isabel II Works

CEINSA running, today, for the Canal de Isabel II in Madrid, various contracts, among others, Project CR-039-10-CY renewal supply network in the Paseo de Extremadura. (MADRID), Project CR-022-10-C5 renewal supply network in Bath Street and others in Torres de La Alameda (Madrid), Project CR-002-10-C4 renewal supply network in the Street Ricardo Ortiz and others. (Madrid), Project CR-004-10-C4 and renovation of the street network Achuri and others in the districts of Ciudad Lineal and San Blas, Madrid. PRESS REVIEW.

2011-12-14 | News | Send Print

The River Ebro Water Management Board rehabilitation awards CEINSA Argilo Palace


	Detail of the Palace of Argilo
Detail of the Palace of Argilo

The River Ebro Water Management Board has awarded CEINSA comprehensive rehabilitation works Argilo Palace, fronts the Square of Spain and adequacy of the right wing for City Council (CC / Morata de Jalon). The Palace of the Counts of Morata de Jalon Argilo is a palace built between 1672 and 1677 under the direction of John Brand on behalf of Francisco Sanz Cortés, the Marquis of Villaverde and Count of Morata and binding. The building was declared a National Monument in 1983,
To carry out the work will attempt to combine the building palatial atmosphere with the latest technological advances, taking special care all the details on which is the lighting and furniture in all units, mixing the aura of old with contemporary designs an attempt to stylistic and timeless dialogue with all services. PRESS REVIEW.

2011-10-13 | News | Send Print

The Regional Government of Extreamdura awarded the construction of a public school in Badajoz UTE CEINSA - LUTRA

The Departement of Education and Culture of the Regional Government of Extreamdura has awarded the construction of new public school 6 +12 units in Slum area of Llera de Badajoz to the UTE CEINSA - LUTRA. The deadline for entries is nine months. The new center and Primary school, located in the neighborhood of Llera Badajoz, occupies a floor area of 3180 meters square and is situated on a plot of 6554.33 meters square. The building consists of three parallel volumes separated by courtyards and connected by a wide hallway perpendicular. You will have two floors, occupying the children's area downstairs and upstairs primary. The project also includes classrooms, administrative area, library, gymnasium, dining, office and auxiliary facilities and two outdoor sports fields. PRESS REVIEW

2011-10-11 | News | Send Print

SEIP awarded to the UTE-CEINSA - SOCEBRO a work in the prison of Teruel

The State Society SEIP Prison Infrastructure and Equipment has been awarded the "Execution of works of the canal diversion project in the prison of Teruel" to the UTE-SOCEBRO CEINSA. PRESS REVIEW.

2011-10-10 | News | Send Print

Almaraz debuts an innovative pavilion after several years of waiting

The multi - purpose sports facility has a corrugated structure surrounded by large windows


	Almaraz multi - purpose sports facility
Almaraz multi - purpose sports facility

With an investment of around 2 million euros were needed to watch over the innovative multi-purpose sports facility of Almaraz
The onset of activity of the newly created College Football has been forced to use the site even before its opening, since several of their teams need an enclosed space in order to participate in federated competitions. The event took place on Saturday night, with the dispute of several friendly matches in different categories and the presentation of all the members of the school, players are not only well Saucedilla Almaraz, or Navalmoral Casatejada.
The building "is impressive," repeated many of the spectators present at the spectacular combination that created the wood, glass and iron, forming a wavy structure, with a huge light that tracks from the outside any activity undertaken in its interior.
The work has been completed in recent months the company CEINSA.
The project was run is two architects Extremadura, Francisco Javier Gomez and Melina Maria Marcos Gomez & Mark Architects and Associates explained that the building, simple lines and generous dimensions, is very innovative and with an introduction situated in the municipality of Almaraz .
"It has a design that calls for the architecture and surround to create an open day and night, varying according to major events and the multiple uses, enabling versatile character. Surprises with its curved opening to visitors and inviting them to go into the center of sports and leisure. " It can accommodate around 660 people in a single tier on one side of the enclosure. PRESS REVIEW.

2011-10-10 | News | Send Print

Ministry of Justice works awarded to CEINSA

The Ministry of Justice’s Deputy General Directorate of Works and Heritage has commissioned CEINSA to enlarge the Court of Justice at Ponferrada, Leon, specifically the Río Oza Street building that houses the facilities common to all benches. PRESS REVIEW

2011-07-14 | News | Send Print
27 Results
Pages: [1] 2 3

CEINSA carry out the refurbishment of the trading floor in main floor of the Bank of Spain c / Alcalá 48, Madrid.

The Bank of Spain is a listed building within a Historic de la Villa de Madrid, and the upper range of archaeological protection Monument and ZPA Historic Precinct. The renovation of the main floor were made in four different areas, which present an obvious deterioration and need a clear renewal and currently do not meet the functional needs required. Of particular importance is the recovery of the original spaces and heights in the area B, and restored in a manner consistent with the architecture of EdificioTradicional. In the process of renovation of the facilities of the Bank of Spain, is intended to unify the entire main floor Patio surrounding the Operations functional areas to house offices with the appropriate degree of quality and comfort. We propose a single project that provides the same features for the entire plant. The works will be implemented in joint venture with CYM Yañez SA. PRESS REVIEW.

- Read more